King Fahd Causeway

Położenie pokaż na mapie

Nasan Island

  • Kategoria: bridges-automobile
  • Sekcja: Islands Bridges - Automobile
The King Fahd Causeway is a causeway connecting Saudi Arabia and Bahrain. Construction started during 1968 and continued until 1986, when it was officially opened to the public. The project cost a total of US$1.2 billion (SAR3 billion). One of the major contractors of the project is Ballast Nedam Group, based in the Netherlands. The four-lane road is 28 km (17 mi) long and approximately 23 m (75 ft) wide, and was built using 350,000 m2 (3,800,000 sq ft) of concrete along with 47,000 metric tonnes of reinforced steel. The causeway is constructed in three segments starting from Saudi Arabia:

1. From Khobar to the Saudi-Bahrain border
2. From the border to Nasan Island, Bahrain
3. From the Nasan island to the main island of Bahrain

Opinie o King Fahd Causeway Dodaj komentarz

Nie mamy jeszcze żadnej opinii :(
Bądź pierwszym, który doda opinię!
Twoja opinia
#0
Podziel się wrażeniami... napisz coś o miejscu...

Położenie na mapie / Jak tam dojechać

Pogoda w okolicy
Dzisiaj (27 kwietnia)
aktualna pogoda w tej lokalizacji
28.6 ° C
25.3 ° (min)     28.9 ° (max)
0 mm
6.4 m/s
1010 hPa
Jutro (28 kwietnia)
pogoda jutro w tej lokalizacji
28.8 ° C
26.6 ° (min)     28.8 ° (max)
0 mm
7.2 m/s
1011 hPa
Pokaż prognozę na 14 dni Źródło: openweathermap.org
Nasz portal stosuje pliki cookies w celach świadczenia Państwu usług na najwyższym poziomie oraz w celach statystycznych i reklamowych. Korzystając z serwisu, zgadzasz się na użycie plików cookie, więcej szczegółów w naszej polityce cookies. Zamknij