King Fahd Causeway
Położenie pokaż na mapie
Nasan Island
- Kategoria: bridges-automobile
- Sekcja: Islands Bridges - Automobile
The King Fahd Causeway is a causeway connecting Saudi Arabia and Bahrain. Construction started during 1968 and continued until 1986, when it was officially opened to the public. The project cost a total of US$1.2 billion (SAR3 billion). One of the major contractors of the project is Ballast Nedam Group, based in the Netherlands. The four-lane road is 28 km (17 mi) long and approximately 23 m (75 ft) wide, and was built using 350,000 m2 (3,800,000 sq ft) of concrete along with 47,000 metric tonnes of reinforced steel. The causeway is constructed in three segments starting from Saudi Arabia:
1. From Khobar to the Saudi-Bahrain border
2. From the border to Nasan Island, Bahrain
3. From the Nasan island to the main island of Bahrain
1. From Khobar to the Saudi-Bahrain border
2. From the border to Nasan Island, Bahrain
3. From the Nasan island to the main island of Bahrain
Położenie na mapie / Jak tam dojechać
Znajdź nocleg w pobliżu (Wyszukianie noclegów w pobliżu tej budowli jest obsługiwane przez Booking.com)
Pogoda w okolicy
Dzisiaj (27 kwietnia)
28.6 ° C
25.3 ° (min) 28.9 ° (max)
0 mm
6.4 m/s
1010 hPa
Jutro (28 kwietnia)
28.8 ° C
26.6 ° (min) 28.8 ° (max)
0 mm
7.2 m/s
1011 hPa
Opinie o King Fahd Causeway Dodaj komentarz
Bądź pierwszym, który doda opinię!