King Fahd Causeway

Position Auf der Karte anzeigen

Nasan Island

  • Kategorie: bridges-automobile
  • Abschnitt: Islands Bridges - Automobile
The King Fahd Causeway is a causeway connecting Saudi Arabia and Bahrain. Construction started during 1968 and continued until 1986, when it was officially opened to the public. The project cost a total of US$1.2 billion (SAR3 billion). One of the major contractors of the project is Ballast Nedam Group, based in the Netherlands. The four-lane road is 28 km (17 mi) long and approximately 23 m (75 ft) wide, and was built using 350,000 m2 (3,800,000 sq ft) of concrete along with 47,000 metric tonnes of reinforced steel. The causeway is constructed in three segments starting from Saudi Arabia:

1. From Khobar to the Saudi-Bahrain border
2. From the border to Nasan Island, Bahrain
3. From the Nasan island to the main island of Bahrain

Bewertungen für King Fahd Causeway einen Kommentar hinzufügen

Wir haben noch keine Meinung :(
Geben Sie als Erster eine Bewertung ab!
deine Meinung
#0
Teilen Sie Ihre Eindrücke ... schreiben Sie etwas über den Ort ...

Standort auf der Karte / Wie man dorthin kommt

Wetter in der Gegend
Heute (14 Dezember)
das aktuelle Wetter an diesem Ort
23.9 ° C
18.1 ° (min)     23.9 ° (max)
0 mm
6.6 m/s
1018 hPa
Morgen (15 Dezember)
Wetter morgen an diesem Ort
18.4 ° C
17.3 ° (min)     21.4 ° (max)
6.9 mm
7.4 m/s
1017 hPa
Vorhersage für 14 Tage anzeigen Quelle: openweathermap.org