Riga Hydro Power Plant (HPP)

Położenie pokaż na mapie

Salaspils

  • Kategoria: dams
  • Sekcja: Dams Power - Hydro
From l-adm-8.energo.lv:

Riga HPP is the most recent of the three hydropower plants on the river Daugava. The first stage of the Daugava hydropower plants cascade was built on the island Dole, 35 km from the Daugava mouth. The construction of Riga HPP was started in 1966, the first hydroaggregate was put into operation in 1974, and in 1976 the hydropower plant was operated at full capacity. Clay and dolomite form the foundation of the hydrotechnical constructions.

Installed capacity, MW: 402
Number of hydro aggregates: 6
Maximum head, m: 18
Dam length, m: 15400
Multiple annual average flow , m3/s: 640
Water reservoir capacity , million m3: 324,6

Opinie o Riga Hydro Power Plant (HPP) Dodaj komentarz

Nie mamy jeszcze żadnej opinii :(
Bądź pierwszym, który doda opinię!
Twoja opinia
#0
Podziel się wrażeniami... napisz coś o miejscu...

Położenie na mapie / Jak tam dojechać

Pogoda w okolicy
Dzisiaj (29 marca)
aktualna pogoda w tej lokalizacji
10.7 ° C
5.7 ° (min)     11.3 ° (max)
4.1 mm
5.5 m/s
999 hPa
Jutro (30 marca)
pogoda jutro w tej lokalizacji
12 ° C
5 ° (min)     14.3 ° (max)
0.4 mm
4.1 m/s
1006 hPa
Pokaż prognozę na 14 dni Źródło: openweathermap.org
Nasz portal stosuje pliki cookies w celach świadczenia Państwu usług na najwyższym poziomie oraz w celach statystycznych i reklamowych. Korzystając z serwisu, zgadzasz się na użycie plików cookie, więcej szczegółów w naszej polityce cookies. Zamknij